07555937675
No products in the cart.
| Document ID | SOP-OPS-04 |
| Parent Document | EZZTECH_03_SOP_Master_Structure |
| Version | v0.1 |
| Date | 18 February 2026 |
| Process Owner | Operations Lead |
| Approval Authority | Managing Directors |
| Classification | Internal – Controlled Document |
To define the controlled process for custom gaming PC builds, ensuring full component traceability, assembly quality, stress testing, and formal release approval prior to dispatch.
Applies to all custom-built gaming PCs assembled by EZZTECH LTD, including B2C and B2B orders.
Technician – Component allocation, assembly, configuration, and testing.
QA Reviewer – Final inspection and burn-in validation.
Operations Lead – Oversight and exception approval.
Risk: Early hardware failure → Mitigation: Mandatory burn-in testing.
Risk: Warranty disputes → Mitigation: Component traceability logging.
Risk: Build specification error → Mitigation: Sales order validation step.
Risk: Overheating issues → Mitigation: Thermal monitoring during stress test.
Review Cycle: Quarterly
Next Review Date: 18 May 2026
Unit 0A01 34 Brindley Rd, Old Trafford, Stratford, Manchester, M16 9HQ
info@ezztech.co.ukCopyright © 2024 EZZTech Ltd.